| Labour charges toward removal and refixing of existing WC cubical partition including required material for reinstallation of WC cubical | NOS | Toilet Partition | Get rate |
| Labour charges towards ceiling services removal and refixing on the same location, wherever required during laying of conduit, cable tray, copper pipe & wire etc. | NOS | Gypsum Ceiling | Get rate |
| Labour charges towards cutting of existing gypsum ceiling required during laying of PVC conduit, Copper pipe & Wires etc. | NOS | Core Cutting | Get rate |
| Labour charges towards Dismantling of gypsum and Corian partition | NOS | Dismantling | Get rate |
| Labour charges towards fixing of Floor tile with epoxy grout 600x600mm | NOS | Ceramic | Get rate |
| Labour charges towards fixing of wall tile with epoxy grout 600x600mm | NOS | Ceramic | Get rate |
| Labour charges towards installation of grid ceiling, support and sil out channels as per existing(0.9NRC) | NOS | Mineral Fiber Ceiling | Get rate |
| Labour Charges towards Installation, Pressure Testing and Commissioning of AC Unit | NOS | HVAC TAB | Get rate |
| Labour charges towards removal & refixing of existing grid ceiling tiles required during laying of PVC conduit, Copper pipe & Wires etc. | NOS | Mineral Fiber Ceiling | Get rate |
| Labour Charges, Wall Mounting WC Fitting with Chair Bracket, Flush Valve, 2-in-1 Bib Cock and Jet Spray, Tissue Paper Holder, Sensor with Plate, 8 Nos; Urinal Labour Charge 3 Nos; Table Top Wash Basin Fixing | NOS | WC | Get rate |
| Labour Charges, WC, Concealed Cistern Tank, Flush Ball, Health Faucet, Paper Holder, Pipeline Work | NOS | WC | Get rate |
| Labour charge towards exsiting floor tile dismentaling work | NOS | Dismantling | Get rate |
| Labour charhe of pantray,and watercluar cophi masin drain and water supply pipe line with CP fitting | NOS | Water Supply | Get rate |
| LABOUR CUOUT | NOS | Core Cutting | Get rate |
| LABOUR (DOOR) | NOS | Doors | Get rate |
| Labour fare & fooding charges | NOS | Annual Maintenance Contract | Get rate |
| LABOUR (FIX) | NOS | Annual Maintenance Contract | Get rate |
| Labour for fabrication of uPVC extruded casement/ sliding windows | SQM | — | Get rate |
| Labour for gypsum board truck unloading – 10 Nos. | NOS | Gypsum Plaster | Get rate |
| Labour for installation of uPVC extruded casement/ sliding windows | SQM | — | Get rate |
| Labour for re installation of existing badminton court and net | NOS | Sports Floor | Get rate |
| LABOUR HELMET | NOS | Safety Signage | Get rate |
| LABOUR JACKET | NOS | Annual Maintenance Contract | Get rate |
| LABOUR (LACQUERED, MIRROR) | NOS | Melamine Polish | Get rate |
| Labour manpower supply | NOS | Annual Maintenance Contract | Get rate |
| Labour night food + Auto rent | NOS | Corrective Maintenance | Get rate |
| Labour of dismantling of glass | NOS | Dismantling | Get rate |
| Labour payment | NOS | Demolition | Get rate |
| Labour Payment, Apr 26 | NOS | Preventive Maintenance | Get rate |
| Labour Payment (As per annexure) | NOS | Annual Maintenance Contract | Get rate |
| Labour Payment (Feb 26) | NOS | Annual Maintenance Contract | Get rate |
| Labour Payment, Jan 26 | NOS | Corrective Maintenance | Get rate |
| Labour Payment (Mar 26) | NOS | Annual Maintenance Contract | Get rate |
| Labour Payment (Open PO) | NOS | Annual Maintenance Contract | Get rate |
| LABOUR ROOM RENT | NOS | Annual Maintenance Contract | Get rate |
| Labour Safety Shoes 8-5 | 9-15 | 10-10 | NOS | Protection Works | Get rate |
| Labour Shoes | NOS | Protection Works | Get rate |
| Labour Shoe, SAF DOT, 7No-2, 8No-2, 9No-2 | NOS | Protection Works | Get rate |
| Labour Shoe, SAF DOT, 8No-7, 9No-5, 10No-3 | NOS | Protection Works | Get rate |
| Labour supply for removing base tar and Solar edge foundation cutting. | NOS | Core Cutting | Get rate |
| Labour Transfer | NOS | Repair Works | Get rate |
| LABOUR & TRANSPORTATION CHARGES | NOS | Debris Removal | Get rate |
| Labour, transportation, silicon charges | NOS | Debris Removal | Get rate |
| Labour Unloading & Shifiting Labour Charges For Loading Unloading and Lifting Shifting og the materials at Site | NOS | Debris Removal | Get rate |
| Labour wages | NOS | Annual Maintenance Contract | Get rate |
| Labour Wages, 01-04-2026 to 30-04-2026 | NOS | Annual Maintenance Contract | Get rate |
| Labour Wages, 01-05-2026 to 15-05-2026 | NOS | Maintenance | Get rate |
| Labour Wages, 01-06-2026 to 15-06-2026 | NOS | Preventive Maintenance | Get rate |
| Labour Wages, 15-03-2026 to 31-03-2026 | NOS | Maintenance | Get rate |
| Labour wages, 16-05-2026 to 31-05-2026 | NOS | Annual Maintenance Contract | Get rate |