QP QuantProc Catalogue
WebsiteLive DemandJoin free

Construction Material & Services Catalogue

17,935 standardised items with live market rates from verified suppliers. Search yours, get quotes in minutes.
ItemUnitCategory
Labour charges toward removal and refixing of existing WC cubical partition including required material for reinstallation of WC cubicalNOSToilet PartitionGet rate
Labour charges towards ceiling services removal and refixing on the same location, wherever required during laying of conduit, cable tray, copper pipe & wire etc.NOSGypsum CeilingGet rate
Labour charges towards cutting of existing gypsum ceiling required during laying of PVC conduit, Copper pipe & Wires etc.NOSCore CuttingGet rate
Labour charges towards Dismantling of gypsum and Corian partitionNOSDismantlingGet rate
Labour charges towards fixing of Floor tile with epoxy grout 600x600mmNOSCeramicGet rate
Labour charges towards fixing of wall tile with epoxy grout 600x600mmNOSCeramicGet rate
Labour charges towards installation of grid ceiling, support and sil out channels as per existing(0.9NRC)NOSMineral Fiber CeilingGet rate
Labour Charges towards Installation, Pressure Testing and Commissioning of AC UnitNOSHVAC TABGet rate
Labour charges towards removal & refixing of existing grid ceiling tiles required during laying of PVC conduit, Copper pipe & Wires etc.NOSMineral Fiber CeilingGet rate
Labour Charges, Wall Mounting WC Fitting with Chair Bracket, Flush Valve, 2-in-1 Bib Cock and Jet Spray, Tissue Paper Holder, Sensor with Plate, 8 Nos; Urinal Labour Charge 3 Nos; Table Top Wash Basin FixingNOSWCGet rate
Labour Charges, WC, Concealed Cistern Tank, Flush Ball, Health Faucet, Paper Holder, Pipeline WorkNOSWCGet rate
Labour charge towards exsiting floor tile dismentaling workNOSDismantlingGet rate
Labour charhe of pantray,and watercluar cophi masin drain and water supply pipe line with CP fittingNOSWater SupplyGet rate
LABOUR CUOUTNOSCore CuttingGet rate
LABOUR (DOOR)NOSDoorsGet rate
Labour fare & fooding chargesNOSAnnual Maintenance ContractGet rate
LABOUR (FIX)NOSAnnual Maintenance ContractGet rate
Labour for fabrication of uPVC extruded casement/ sliding windowsSQM—Get rate
Labour for gypsum board truck unloading – 10 Nos.NOSGypsum PlasterGet rate
Labour for installation of uPVC extruded casement/ sliding windowsSQM—Get rate
Labour for re installation of existing badminton court and netNOSSports FloorGet rate
LABOUR HELMETNOSSafety SignageGet rate
LABOUR JACKETNOSAnnual Maintenance ContractGet rate
LABOUR (LACQUERED, MIRROR)NOSMelamine PolishGet rate
Labour manpower supplyNOSAnnual Maintenance ContractGet rate
Labour night food + Auto rentNOSCorrective MaintenanceGet rate
Labour of dismantling of glassNOSDismantlingGet rate
Labour paymentNOSDemolitionGet rate
Labour Payment, Apr 26NOSPreventive MaintenanceGet rate
Labour Payment (As per annexure)NOSAnnual Maintenance ContractGet rate
Labour Payment (Feb 26)NOSAnnual Maintenance ContractGet rate
Labour Payment, Jan 26NOSCorrective MaintenanceGet rate
Labour Payment (Mar 26)NOSAnnual Maintenance ContractGet rate
Labour Payment (Open PO)NOSAnnual Maintenance ContractGet rate
LABOUR ROOM RENTNOSAnnual Maintenance ContractGet rate
Labour Safety Shoes 8-5 | 9-15 | 10-10NOSProtection WorksGet rate
Labour ShoesNOSProtection WorksGet rate
Labour Shoe, SAF DOT, 7No-2, 8No-2, 9No-2NOSProtection WorksGet rate
Labour Shoe, SAF DOT, 8No-7, 9No-5, 10No-3NOSProtection WorksGet rate
Labour supply for removing base tar and Solar edge foundation cutting.NOSCore CuttingGet rate
Labour TransferNOSRepair WorksGet rate
LABOUR & TRANSPORTATION CHARGESNOSDebris RemovalGet rate
Labour, transportation, silicon chargesNOSDebris RemovalGet rate
Labour Unloading & Shifiting Labour Charges For Loading Unloading and Lifting Shifting og the materials at SiteNOSDebris RemovalGet rate
Labour wagesNOSAnnual Maintenance ContractGet rate
Labour Wages, 01-04-2026 to 30-04-2026NOSAnnual Maintenance ContractGet rate
Labour Wages, 01-05-2026 to 15-05-2026NOSMaintenanceGet rate
Labour Wages, 01-06-2026 to 15-06-2026NOSPreventive MaintenanceGet rate
Labour Wages, 15-03-2026 to 31-03-2026NOSMaintenanceGet rate
Labour wages, 16-05-2026 to 31-05-2026NOSAnnual Maintenance ContractGet rate
← Prev Page 171 of 359 · 17,935 items Next →
Powered by QuantProc™ · quantproc.com