| Labour charge of exsiting WC, health fouset, paper holder, remove and re-fixing | NOS | WC | Get rate |
| Labour charge of exsiting we, health fouset, paper,holder, remove and re fixing. | NOS | CP Fittings | Get rate |
| Labourcharge of ground floor water cooler drain and water point( drain pipe line connect to swage pipe line | NOS | Water Supply | Get rate |
| Labour charge of PEX pipe line shaft to pantry | NOS | Water Supply | Get rate |
| Labour charge of Ptrap and pipe line leakage reparing and chock cleaning including requard material .include 4 nos of door and p trap door. | NOS | Drainage | Get rate |
| Labour charge of Tile reparing work | NOS | Ceramic | Get rate |
| LABOUR CHARGE OF URINAL REMOVE REFIXING WORK | NOS | Urinal | Get rate |
| Labour charge of wash basin mixer bottal trap re ffixing with pipe line work | NOS | Basin | Get rate |
| Labour charge of Water supply pipe line | NOS | Water Supply | Get rate |
| Labour Charge, Remove Existing Wash Basin, Mixer, Bottle Trap and Pipeline; Supply and Fix New Washbasin, Bottle Trap, Mixer with Pipeline | NOS | Basin | Get rate |
| Labour Charge Rs.650/-, Fooding Charge Rs.150/-, Open PO | NOS | Annual Maintenance Contract | Get rate |
| Labour charges | NOS | Demolition | Get rate |
| Labour charges and minor material | NOS | Breakdown Service | Get rate |
| Labour Charges, Details as per attached vouchers | NOS | Annual Maintenance Contract | Get rate |
| Labour Charges for Brazing, Leak Testing, Vaccuming & commissioning of System 16 HP | NOS | Electrical Testing | Get rate |
| Labour Charges for Dismalting of VRF Cassette unit | NOS | VRF | Get rate |
| labour charges for existing damage glass removing and fixing new one with 3m tap and silicon | NOS | Glass Partition | Get rate |
| Labour Charges for Fabricating Rolling Shutter, Gear, Gear Box, Pipe for Handle and Fixing at 17ft Height, Size: 11'.6" x 17.0" = 196, 2 Nos | NOS | Rolling | Get rate |
| Labour charges for Fixing of new plywood as per site condition & Installation of wash basin mirrors with proper finishing including necessary sealant , etc.. | NOS | Basin | Get rate |
| Labour charges for full round nosing for all exposed edges for Granite work where ever required etc., complete as directed. | Rmt | Polishing | Get rate |
| Labour Charges for Glass Shifting to 4th Flr by Stairs | NOS | Debris Removal | Get rate |
| Labour Charges for Jet Service for Cassette Split 4 TR | NOS | FCU | Get rate |
| Labour Charges for Jet Service for Ductable Split 5.5 TR | NOS | Preventive Maintenance | Get rate |
| Labour Charges for Jet Service for Hi-wall Split 1 & 1.5 TR | NOS | Split AC | Get rate |
| Labour Charges for Jet Service for Hi-wall Split 2 TR | NOS | VRV | Get rate |
| Labour Charges for Jet Service for Tower Split 3 TR | NOS | VRV | Get rate |
| Labour Charges for Jet Service for VRF Ductable Indoor Unit 6.5 TR | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF Ductable Indoor Unit 6.8 TR | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF Indoor Unit Cassette Split | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF Indoor Unit TFA 4 TR | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF Indoor Unit TFA 8 TR | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF ODU Unit 10 HP | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF ODU Unit 14 HP | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF ODU Unit 16 HP | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF ODU Unit 18 HP | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF ODU Unit 21 HP | NOS | VRF | Get rate |
| Labour Charges for Jet Service for VRF ODU Unit 7.5 HP | NOS | VRF | Get rate |
| Labour Charges for loading, unloading lifting and shifting of material at site | NOS | Debris Removal | Get rate |
| Labour charges for plaster of ledge wall | NOS | Double Coat | Get rate |
| Labour charges for Removal of existing Damaged and faded Wall Mirrors, 6mm thickness, Handwash area, sizes: L-1803mm x H-1066mm, L-1422mm x H-1066mm, L-863mm x H-1066mm, UOM (1PC=1LS) | NOS | Demolition | Get rate |
| Labour charges for Removal of existing Plywood, L-4308mm x H-1016mm | NOS | Dismantling | Get rate |
| Labour Charges for Removing existing Wall Panel, Framing new Aluminium Structure to Ceiling Height, Fixing Plywood, Pasting Stone Lam and Architectural Metal, along with Corner Guard and T Profile | NOS | Core Cutting | Get rate |
| Labour charges for Shifting of Workstation, 21 Nos., with necessary civil, electrical and network works with material | NOS | Workstation | Get rate |
| Labour Charges for Shifting & Re installation of VRF Cassette Unit | NOS | VRF | Get rate |
| Labour Charges for Water Supply Pipeline with Domestic Supply Line, Installation of 2 WC and 4 Wash Basin including Tap Installation, 2 Shower, 2 Concealed Cisterns, 1 Sink with Tap in Wet Pantry | NOS | Water Supply | Get rate |
| Labour Charges, Handicap Washroom WC Leakage Rectification, WC Fitting, Wash Basin Fitting, Drain Pipe Choke Cleaning and Repairing Work | NOS | WC | Get rate |
| Labour Charges, Installation of Ply Board, 18mm, Washbasin Counter, Includes all hardware material | NOS | Vanity | Get rate |
| Labourcharges of all debris removing from site area | NOS | Debris Removal | Get rate |
| Labour Charges of Creating 50mm Gypsum Partition with proper finishing | NOS | Gypsum Ceiling | Get rate |
| Labour charges to fix old door | NOS | Doors | Get rate |