| Installation of Aluminium Frame with Hylam Sheet & Plywood | NOS | ACP Frame | Get rate |
| Installation of Aluminium grill. | NOS | Grill | Get rate |
| Installation of Aluminum Framing with 18mm Plywood support (slab support 3 feet to ceiling, Lintel for glass partition); Installation of 18mm Plywood portal U-section 4inch x 4inch with outer 6mm MDF, 100 SFT | NOS | Aluminium Fabrication | Get rate |
| Installation of Aluminum Skirting | NOS | Skirting | Get rate |
| Installation of Anti Skid Tiles for Existing Security Check Points and New Turnstiles Floor | NOS | Ceramic | Get rate |
| Installation of Axiom Trim | NOS | Metal Ceiling | Get rate |
| Installation of BUSTAR PUMP and GIRISH TRAP | NOS | Pumps | Get rate |
| Installation of Cabling for all electrical work station points from distribution box. with required diamond piping 25 mm. 2.5 Sqmm single core wire | NOS | Cabling | Get rate |
| Installation of Carpet | NOS | Carpet | Get rate |
| Installation of Carpet Tile, Grid Series, Made in South Africa, Grid Horizon & Grid Sunset for Black Out Area; Grid Cloud Break for CBH Cabin & Board Room | NOS | Carpet Tile | Get rate |
| Installation of concealed cistern tank with cpvc pipe elbow tee socket mta, fta solvent inclidmaterial . | NOS | Water Supply | Get rate |
| Installation of corner gurad ( sqft 40). | NOS | Decorative Panel | Get rate |
| Installation of Diffuser without Plenum Box | NOS | Diffuser | Get rate |
| Installation Of Diffuser with plenum box | NOS | Diffuser | Get rate |
| Installation of dishwasher and drain pipe water supply pipe line with CP fitting | NOS | Water Supply | Get rate |
| INSTALLATION OF DOOR | NOS | Doors | Get rate |
| Installation of door frame and frameless glass door | NOS | Glass Door | Get rate |
| INSTALLATION OF DOOR FRAME FOR FLUSH (SOLID) DOOR | NOS | Door Frames | Get rate |
| INSTALLATION OF DOOR FRAME & HINGE GLASS DOOR | NOS | Glass Door | Get rate |
| Installation of doorframes and glass door (Patch fitting) | NOS | Glass Door | Get rate |
| Installation of Door Frame & Stile Door Shutter with all. | NOS | Doors | Get rate |
| Installation of double board gypsum partition | NOS | Gypsum Ceiling | Get rate |
| Installation of double-layered gypsum partition and grid ceiling | NOS | Gypsum Ceiling | Get rate |
| INSTALLATION OF ELECTRIC WORK AS PER ATTACHED ANNEXURE | NOS | Wiring | Get rate |
| Installation of existing WC with washer,Pan connector,brackets ,cistern pipe,110mm dia pvc pipe fixing, and 60mm dia pvc pipe fixing etc. | NOS | WC | Get rate |
| Installation of fast floor shaft CI pipe line dismantling and new y tee socket fitting and pump pipe line conncet | NOS | Drainage | Get rate |
| Installation of Felt Acoustic | NOS | Acoustic Panel | Get rate |
| Installation of Fire sprinkler flexible. | NOS | Sprinkler | Get rate |
| Installation of Fire sprinkler & Roset plate. | NOS | Sprinkler | Get rate |
| Installation of fixed glazed frame and glass | NOS | Structural Glazing | Get rate |
| Installation of fix glazed Al. frame & Glass | NOS | Glass Partition | Get rate |
| INSTALLATION OF FIX GLAZING | NOS | Structural Glazing | Get rate |
| Installation of floor and wall tiles of size 600×600 mm (tiles to be supplied by AIMS Buildmart) laid on cement mortar bedding for flooring and cement plaster backing for wall surfaces. NOTE-Tiles shall be fixed with 3 mm spacers, and joints shall be fill | NOS | Ceramic | Get rate |
| Installation Of floor Machine and Hardware | NOS | Floor Hardener | Get rate |
| Installation of Floor Tiles, 600x1200mm, laid on MYK Laticrete Adhesive, 3mm Spacers, Joints filled with Approved Tile Adhesive Grout | NOS | Ceramic | Get rate |
| Installation of fluted panel with ply backing support. | NOS | Decorative Panel | Get rate |
| Installation of gate & testing of smooth running | NOS | Gate | Get rate |
| Installation of Glass door (including bus fare & outstations expenses) | NOS | Glass Door | Get rate |
| INSTALLATION OF GLASS DOOR ON FLOOR SPRING | NOS | Glass Door | Get rate |
| Installation of grills | NOS | Grill | Get rate |
| Installation of GSS Duct Modification Works including necessary fittings | NOS | Ducting | Get rate |
| Installation of GSS plenum box (Size : 450MM X 450MM - 250MM Dia) - (Location : 12B ,10th Floor,Optum,Work Station) | NOS | Ducting | Get rate |
| Installation of gypsum ceiling | NOS | Gypsum Ceiling | Get rate |
| Installation of Gypsum Ceiling Repair at urnial area size -12x4 feet | NOS | Gypsum Ceiling | Get rate |
| Installation of Hand Dryer | NOS | CP Fittings | Get rate |
| Installation of hinge(Replacement) | NOS | Hinges | Get rate |
| Installation of HVAC Equipment, Laying of Copper Piping, Drain Piping, Wiring & N2 Testing, As per Attached Annexure | NOS | VRV | Get rate |
| Installation of Indoor Units | NOS | FCU | Get rate |
| Installation of inline fan hanging with threaded rod & fastenering | NOS | Exhaust | Get rate |
| Installation of Interlocking Rubber Gym Tiles 15mm | NOS | Sports Floor | Get rate |