| INSTALLATION CHARGES (URINAL PARTITION) | NOS | Toilet Partition | Get rate |
| Installation Charges, Without any carpentry, civil work (in buyers scope) | NOS | Corrective Maintenance | Get rate |
| Installation Charges W/o Material | NOS | Annual Maintenance Contract | Get rate |
| Installation & Configuration | NOS | Final Commissioning | Get rate |
| Installation & Configuration (CCTV) | NOS | CCTV | Get rate |
| Installation & Configuration Charge, Camera | NOS | CCTV | Get rate |
| Installation & Configuration Charge, Conference Room | NOS | Video Conference | Get rate |
| Installation & Configuration Charge, Sensor | NOS | Smart Switch | Get rate |
| INSTALLATION DOOR FRAME | NOS | Door Frames | Get rate |
| Installation & duct modification works | NOS | Ducting | Get rate |
| Installation & DVR Commissioning for Camera and Laying of Cat 6A Wire in 6 Nos Camera | NOS | CCTV | Get rate |
| Installation false floore | NOS | Raised Floor | Get rate |
| INSTALLATION & FIXING 18 MM PLY FOR WALL STRENGTH FOR TV 5 NOS | NOS | Wall Panel | Get rate |
| Installation Floor and Wall Tiles, 600x600mm, laid on cement mortar bedding for flooring and cement plaster backing for walls, fixed with 3mm spacers (tiles supplied by AIMS Buildmart) | NOS | Ceramic | Get rate |
| Installation (Freight Charges +Unloading +Installation +Glue +Plastic Covering) | NOS | Breakdown Service | Get rate |
| Installation Gypsum ceiling | NOS | Gypsum Ceiling | Get rate |
| Installation Hardrawn Copper Piping between Indoor & Outdoor Units, 9mm thk Tubular Foam Insulation, including necessary fittings, Janya / Rajco MAKE | NOS | VRV | Get rate |
| Installation, HOF Flooring | NOS | Vinyl | Get rate |
| Installation & Implementation of Single Door Lock & Accessories along with imparting of training. | NOS | Access Control | Get rate |
| Installation Metal Tile Grid False Ceiling, 600x600mm, Regular Height Execution | NOS | Metal Ceiling | Get rate |
| Installation, modification and alignment of gypsum and grid ceiling, Area 550 Sqft | NOS | Gypsum Ceiling | Get rate |
| Installation Nylon Carpet, MULTI-LEVEL PATTERN LOOP PILE, Face Fibre 100% NYLON 6,0, Finished Face Weight 20 oz per sq yd, Gauge 1/12 per inch, SMJ MAKE, Model CAMBORNE PLANK-CM220303-Taupe | NOS | Carpet Tile | Get rate |
| Installation of 100mm raceways for turnstile installation. | NOS | Access Control | Get rate |
| Installation of 10MM CLEAR TOUGHENED GLASS | NOS | Toughened Glass | Get rate |
| Installation of 12mm ply board on wall in debi meeting room to strengthened the wall | NOS | Wall Panel | Get rate |
| Installation of 12 mm Ply Fixing of ceiling with laminated finish with framing | NOS | Grid Ceiling | Get rate |
| Installation of 12 mm Ply fixing of Window Sill | NOS | Wooden Window | Get rate |
| Installation of 12mm ply fixing window seal | NOS | Wooden Window | Get rate |
| Installation of 12 mm Ply with fluted Panel | NOS | Decorative Panel | Get rate |
| Installation of 16 fliptop boxes, 2 switches and 5 sockets per fliptop box, cutting of raceway and calcium silicate tiles for cable routing, cabling for all switches and sockets | NOS | Wiring | Get rate |
| installation of 20mm cpvc pipe elbow tee socket.MTA,solvent with chillclamp bulet fasnar | NOS | Water Supply | Get rate |
| INSTALLATION OF 24 MM SOUND SCAPE CLOUD CEILING PANELS. | NOS | Acoustic Ceiling | Get rate |
| INSTALLATION OF 25X45 AL. PROFILE FRAME & GLASS FIX GLAZED PARTITION | NOS | Glass Partition | Get rate |
| Installation of 32mmGI pipe line fitting | NOS | Water Supply | Get rate |
| Installation of 32mmGI pipe line fitting ( for ground floor pantry drain pipe ) | NOS | Drainage | Get rate |
| INSTALLATION OF 3.8 FEET ( HEIGHT) X 3.2 FEET (WIDTH) WOODEN ALMRAH | NOS | Wardrobe | Get rate |
| Installation of 40mm Cpvc pipe and elbow,socket,tee solvent chill clamp thread rood,bulet fasnar,with insulation pipe | NOS | Water Supply | Get rate |
| Installation of 450 mm deep overhead storage (2 feet x 22) with both side laminate pasting, including handles and hinges. | NOS | Cabinet | Get rate |
| Installation of 4 Way Cassette & Ductable ac hanging with fastner & Threded rods and support | NOS | FCU | Get rate |
| Installation of 600 mm Deep Full Height Open Display Unit | NOS | Cabinet | Get rate |
| Installation of 600x600mm Metal Tile Grid False Ceiling -56 Sqft and Axiom Trim -36 Rft @Regular Height Execution | NOS | Metal Ceiling | Get rate |
| INSTALLATION OF 6MM WHITE LACQUERED MTG | NOS | Glass Partition | Get rate |
| Installation of 75 mm aluminum skirting | NOS | Skirting | Get rate |
| Installation of 75mm aluminum skirting | NOS | Skirting | Get rate |
| Installation of 9 mm thickness acoustic with triangle shapes cutting | NOS | Acoustic Panel | Get rate |
| Installation of above materials | NOS | Corrective Maintenance | Get rate |
| INSTALLATION OF ACOUSTIC PANELS | NOS | Acoustic Panel | Get rate |
| Installation of acoustic panels in Debi meeting room- Design and Colour to be approved by site team or as per existing with U channel support by 6mm deep inside the gypsum | NOS | Acoustic Panel | Get rate |
| Installation of Acoustic Wall Paneling (installation on laid area) | NOS | Acoustic Panel | Get rate |
| Installation of all plumbing pipe line and sanitary fittings including pit making and SS Grating, 450x450mm fixing | NOS | Water Supply | Get rate |