| Dismantling of existing sagging gypsum ceiling, including removal of GI main sections, secondary sections, perimeter channels, fasteners, and all associated accessories, with proper handling and disposal of debris, complete in all respects. | NOS | Dismantling | Get rate |
| Dismantling of existing smoke detector | NOS | Dismantling | Get rate |
| Dismantling of existing speakers | NOS | Dismantling | Get rate |
| Dismantling of existing tiles | NOS | Dismantling | Get rate |
| Dismantling of Existing Toilet, 500 Sq.ft per Floor, Complete Stall Partition, Toilet Fixtures, Wash Basin, WC, Urinal, Flooring & Block/Brick Work as per site, including stocking debris in allocated location & shifting of debris out | NOS | Dismantling | Get rate |
| Dismantling of existing turnstile civil structure | NOS | Dismantling | Get rate |
| Dismantling of existing undercounter cabinet. Size 14.5x2.5 | NOS | Dismantling | Get rate |
| Dismantling of existing under-floor PVC pipeline,including careful removal of pipes, fittings, and joints, | NOS | Dismantling | Get rate |
| Dismantling of Existing wooden partition | NOS | Dismantling | Get rate |
| Dismantling of existing wooden partition and door opening, 1000mm x 2400mm | NOS | Dismantling | Get rate |
| Dismantling of existing work station | NOS | Dismantling | Get rate |
| Dismantling of existing work station As per Drawing with remaining work station side corner proper finising like side cap nut bolts etc. | NOS | Dismantling | Get rate |
| Dismantling of Fix Glazing, 3' x 8', 11 Nos | NOS | Dismantling | Get rate |
| Dismantling of floor carpet | NOS | Dismantling | Get rate |
| Dismantling of floor stone with skirting including disposal of malba; fixing of italian marble stone similar colour and design as per approved sample | NOS | Dismantling | Get rate |
| Dismantling of Floor Stone with Skirting Including Disposal of Malba; Fixing of Italian Marble Stone Similar Colour and Design as per Approved Sample | NOS | Dismantling | Get rate |
| Dismantling of floor tile of existing security check point and new turnstiles floor | NOS | Dismantling | Get rate |
| Dismantling of floor tiles | NOS | Dismantling | Get rate |
| Dismantling of Gents and Ladies Washroom Existing PCC Brickbat Coba with Sunken Area and Pipeline | NOS | Demolition | Get rate |
| Dismantling of Handicap washroom existing pcc brickbat cobs with sunken area. | NOS | Demolition | Get rate |
| Dismantling of Hendicap washromm existing pcc bricbat coba with sunken aerea | NOS | Dismantling | Get rate |
| Dismantling of laminates and refixing of new laminate both sides on counter, required shade, adhesive fixed, Size 10x2, including hardware removing and refixing, Standard MAKE | NOS | Laminate Panel | Get rate |
| Dismantling of laminates & refixing of new laminate both side on counter of required shade with help of adhesive, Size 10x2, including Hardware removing & refixing, Standard MAKE | NOS | Laminate Panel | Get rate |
| Dismantling of Laminates & Refixing of New Laminate Both Side on Counter, Required Shade, With Adhesive, Size 10x2, Including Hardware Removing & Refixing, Standard MAKE | NOS | Laminate Panel | Get rate |
| Dismantling of office assets as per list (annexure) provided, Demolition of 2nd Floor as per scope of work, Simple packing & moving of only high value equipment’s to basements, and other material shifting only, Segregating the scarp & debris, shift all sc | NOS | Dismantling | Get rate |
| Dismantling of office assets as per list (annexure) provided, Demolition of 4th Floor as per scope of work, Simple packing & moving of only high value equipment’s to basements, and other material shifting only, Segregating the scarp & debris, shift all sc | NOS | Dismantling | Get rate |
| Dismantling of Pendent Sprinkler | NOS | Sprinkler | Get rate |
| Dismantling of PowerPoint and shifting in another location | NOS | Dismantling | Get rate |
| Dismantling of PVC / Wooden Flooring Including Skirting, Without Damaging Original Terrazzo Flooring, Including All Leads, Lifts, Cartage from Work Area to Site Yard, Stacking of Reusable Material as per Site Incharge Instructions, All Complete | SQM | Dismantling | Get rate |
| Dismantling of the existing gypsum ceiling at the cafeteria. | NOS | Dismantling | Get rate |
| Dismantling of the grid ceiling, reinstallation of the gypsum ceiling, and alignment of the old grid ceiling (250 sq. ft.) | NOS | Dismantling | Get rate |
| DISMANTLING OF WORKSTATION | NOS | Dismantling | Get rate |
| Dismantling old plaster /Old shortcrete Treatment from RCC structural members / masonary walls including removing / cutting Chicken Wire mesh or weld mesh from any place including raking out joints of brick wall and cleaning the surface for receiving new plaster, stacking the unserviceable materials | SqM | Dismantling | Get rate |
| Dismantling Old Plaster or Skirting, Raking Out Joints & Cleaning Surface for Plaster, Including Disposal of Rubbish to Dumping Ground Within 50 m Lead | SQM | Dismantling | Get rate |
| Dismantling, Precast Concrete or Stone Slabs, Walls & Partition Walls, Including Stacking Within 50 m Lead, Thickness Up to 40 mm | SQM | Dismantling | Get rate |
| Dismantling & Preparation Works: Dismantling of Existing Floors/Ceiling/MEP services/Light fixtures/existing assets | NOS | Dismantling | Get rate |
| DISMANTLING & REFIXING OF WASHBASIN & SENSOR TAP | NOS | Basin | Get rate |
| DISMANTLING & REFIXING OF WASHBASIN & SENSOR TAP. | NOS | Basin | Get rate |
| Dismantling & Refixing of Washbasin & Sensor Tap, 6th and 8th Floor | NOS | Basin | Get rate |
| Dismantling & Reinstallation, KFSS Extinguisher, 03GENLDIS-RC | NOS | Fire Extinguisher | Get rate |
| Dismantling & Reinstallation, KFSS Indication Panel, Model 03GENLDIS-RC | NOS | Dismantling | Get rate |
| Dismantling & Re-Installation Smoke Detector, Honeywell MAKE, Model FSP-951 | NOS | Fire Alarm | Get rate |
| Dismantling & Reinstatement work | NOS | Dismantling | Get rate |
| Dismantling & Reinstatement work at DDC18C | NOS | Dismantling | Get rate |
| Dismantling & Reinstatement work at DDC5E - 1st Floor | NOS | Dismantling | Get rate |
| Dismantling & Reinstatement work at DDC5E - 6th Floor | NOS | Dismantling | Get rate |
| Dismantling & removing of damage Veneer of existing Low height storage | NOS | Dismantling | Get rate |
| Dismantling Soft Board & Fixing Gypsum Partition | NOS | Gypsum Ceiling | Get rate |
| Dismantling, Steel Work, Built-Up Sections, Angles/Tees/Flats/Channels, Including Gusset Plates, Bolts, Nuts, Cutting Rivets & Welding, Dismembering & Stacking | MT | Dismantling | Get rate |
| Dismantling Tile Work, Floors & Roofs, Laid in Cement Mortar, Tile Thickness 10 mm to 25 mm, Including Stacking Within 50 m Lead | SQM | Dismantling | Get rate |