| Deduction against Purchase of Paint Material | NOS | Emulsion | Get rate |
| Deduction - Already Paid Amount against corresponding PO: PO-00447 from Perficient Services | NOS | Annual Maintenance Contract | Get rate |
| Deduction on purchase of material from Uttam Glass co. (Invoice No. 41586 Dated- 21-June-2025) | NOS | Toughened Glass | Get rate |
| DEEPALI-DE-303 37"x18"x7" Single Bowl Steel Sink with Drain Board Exclusive Glossy | NOS | Basin | Get rate |
| Deep Cleaning | NOS | Corrective Maintenance | Get rate |
| Deep cleaning at 2nd Floor | NOS | Corrective Maintenance | Get rate |
| Deep cleaning at 5 th Floor | NOS | Corrective Maintenance | Get rate |
| Deep cleaning work | NOS | Corrective Maintenance | Get rate |
| DEER WPP 220 | NOS | Paint | Get rate |
| Dehradun white lime | QTL | — | Get rate |
| DELIEVERY CHARGES | NOS | Annual Maintenance Contract | Get rate |
| Delineator | NOS | — | Get rate |
| Deliver and Installation | NOS | Breakdown Service | Get rate |
| Deliver Carges | NOS | Debris Removal | Get rate |
| Delivery | NOS | Material Storage | Get rate |
| Delivery and Installation charges | NOS | Annual Maintenance Contract | Get rate |
| Delivery at ground floor | NOS | Maintenance | Get rate |
| DELIVERY AT GROUND FLOOR(Freight) | NOS | Cart Away | Get rate |
| Delivery cahrges | NOS | Breakdown Service | Get rate |
| Delivery charegs | NOS | Breakdown Service | Get rate |
| Delivery Charge | NOS | Corrective Maintenance | Get rate |
| Delivery charges | NOS | Annual Maintenance Contract | Get rate |
| Delivery charges 18% | NOS | SITC | Get rate |
| DELIVERY CHARGES (BANGALORE TO GURUGAON) | NOS | Annual Maintenance Contract | Get rate |
| Delivery Charges, Noida to Kolkata | NOS | Annual Maintenance Contract | Get rate |
| Delivery Charges (Project site) Local | NOS | Annual Maintenance Contract | Get rate |
| Delivery Charges Recd | NOS | Material Storage | Get rate |
| Delivery Charges, Standard Carpet, Origin Bangalore, Destination Jaipur | NOS | Carpet Tile | Get rate |
| Delivery Charges towards the Delivery of Materials | NOS | Annual Maintenance Contract | Get rate |
| Delivery Charges upto ground floor | NOS | Debris Removal | Get rate |
| Delivery expense | NOS | Annual Maintenance Contract | Get rate |
| Delivery & Handling Charge | NOS | Material Storage | Get rate |
| Delivery & Installation | NOS | Annual Maintenance Contract | Get rate |
| Delivery & Lifting Charges | NOS | Breakdown Service | Get rate |
| DELIVERY & LIFTING CHARGES AS PER ACTUAL | NOS | Corrective Maintenance | Get rate |
| Delivery /Loading/Unloading | NOS | Breakdown Service | Get rate |
| Delivery/ Porter Charges | NOS | Material Storage | Get rate |
| Delivery/Shipping Charges | NOS | Breakdown Service | Get rate |
| Delphi crema (matt) 600*1200 | NOS | Vitrified | Get rate |
| DELPHI GREY 24X24 | NOS | Vitrified | Get rate |
| Delphi Gris, Matt, 600x1200 | NOS | Vitrified | Get rate |
| Del[very Charges | NOS | Annual Maintenance Contract | Get rate |
| Demolation of glass Partition & Gypsum partiotion and shifting the materials from floor to lower basement. | NOS | Dismantling | Get rate |
| Demolishing Brick Work, Manually / By Mechanical Means, Including Stacking of Serviceable Material & Disposal of Unserviceable Material, 50 M Lead, In Cement Mortar, As Directed by Engineer-in-Charge | CUM | Demolition | Get rate |
| Demolishing brick work of any thickness manually/ by mechanical and disposal of debris to contractor's own dump outside the compound as per direction of Engineer in-charge. | Cum | Demolition | Get rate |
| Demolishing of flooring of any type (tile/ kota/ granite/ marble/ cast -in-d-situ marble mosaic etc.) by manually/ mechanical and disposing off as per direction of Engineer-in-charge. | Sqm | Demolition | Get rate |
| Demolishing plain cement concrete of any thickness manually/ by mechanical means, cutting of reinforcment bars etc including stacking the reusable materials and removed unserviceable materials / debris as per direction of Engineer - in - charge.The disposal of removed material / debris out side the | Cum | Demolition | Get rate |
| Demolishing RCC Work, Manually / By Mechanical Means, Including Stacking of Steel Bars & Disposal of Unserviceable Material, 50 M Lead, As Directed by Engineer-in-Charge | CUM | Demolition | Get rate |
| Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | — | — | Get rate |
| Demolition | NOS | Dismantling | Get rate |