| Chair, Mid Back, Conference Room, Width 600+/-5mm, Depth 640+/-5mm, Total Height 995-1095+/-5mm, Back Width 425mm Top/500mm Bottom, Seat Width 500+/-5mm, Seat Depth 470+/-5mm | NOS | Chair | Get rate |
| Chair (Nilkamal) | NOS | Chair | Get rate |
| Chair parts assembling work | NOS | Chair | Get rate |
| CHAIR REPAIRING | NOS | Corrective Maintenance | Get rate |
| Chairs as per reference image shared and discussed@9250 | NOS | Chair | Get rate |
| Chairs, PB-8055, 14 Nos White, 14 Nos Yellow | NOS | Chair | Get rate |
| Chair stickers | NOS | Branding Graphics | Get rate |
| Chair, Three Seater, Full Handle, SS202, Metro MAKE | NOS | Chair | Get rate |
| Chair, Training Room, Unwind, Raspberry Red, Godrej MAKE | NOS | Chair | Get rate |
| Chair, without Arm, Brown | NOS | Chair | Get rate |
| Challies | NOS | — | Get rate |
| Changes in locks, hardware items, and other petty expenses incurred during the process | NOS | Locks | Get rate |
| Channal 25mm setia | NOS | Gypsum Partition | Get rate |
| CHANNEL 7 FEET | NOS | MS Fabrication | Get rate |
| Charcoal Louvers Shade No - LN 1809 | NOS | Grill | Get rate |
| Charcoal Louvers, Shade No LN 1809 | NOS | Grill | Get rate |
| Charcoal Louvers, Shade No LN 1809 | NOS | Grill | Get rate |
| Chargers towards grid ceiling removing and shifting towards client allocated area. | NOS | Mineral Fiber Ceiling | Get rate |
| Chargers towards removing of Gypsum partition | NOS | Dismantling | Get rate |
| Charges for Brick Bats/Light Weight Aerocon Block, Sunken Area Re-Filling, Existing Block | NOS | Concrete Block | Get rate |
| Charges for Delivery | NOS | SITC | Get rate |
| Charges for Gas Top-up of PAC | NOS | VRV | Get rate |
| Charges for Gypsum Board Ceiling for partition of glass holding the frame down 6inch from the false ceiling with ply support from true ceiling | NOS | Gypsum Ceiling | Get rate |
| Charges for installation of VAV box along with electrical cable there is no any material involved in this quote all supporting material will be provided by customer like electrical cable, communication cable, nut bolt faster etc | NOS | Ducting | Get rate |
| Charges for modification of existing HVAC system, including dismantling, shifting, and refixing of ducts, diffusers, grills, piping, insulation, and necessary accessories, along with testing and commissioning, complete in all respects | NOS | Ducting | Get rate |
| Charges for Office Assets (As per below BOQ), including packing using quality packing material like, multi ply corrugated carton box, corrugated sheet, news print, foam sheet poly urethane, silica gel masking tape, marking labeling, inventory supervision, | NOS | Annual Maintenance Contract | Get rate |
| Charges for shifting of sprinkler after ceiling installation with required flexible pipe, sprinkler, mounting bracket etc. | NOS | Sprinkler | Get rate |
| Charges towards clearing debris from site and deep cleaning | NOS | Debris Removal | Get rate |
| Charges towards debris dispose off under the GMC norms | NOS | Debris Removal | Get rate |
| Charges Towards Dismantling of wall for electrical pipes & replastering on it with 1:4 ratio of cement sand mortar. | NOS | Demolition | Get rate |
| Charges towards dismantling of Wall tiles with all required tools | NOS | Demolition | Get rate |
| Charges towards Electrical Panel removal and re-installation with thimbling, connections, termination & commissioning complete at AHU room, entire area cable dressing work included, carefully remove the old electrical panel | NOS | Distribution Board | Get rate |
| Charges towards finishing of ceiling with necessary materials from where the glass partition removed with mattril | NOS | Gypsum Ceiling | Get rate |
| Charges towards floor chipping work and refinishing the same | NOS | Demolition | Get rate |
| Charges towards installation of 18mm Granite stone with 200mm height. , charges includes cutting of sink , cutting of two dusbin cover for each counter, moulding rubbing and polishing work included. | NOS | Granite Flooring | Get rate |
| Charges towards jointing taping for gypsum partition (With Material) | NOS | Gypsum Ceiling | Get rate |
| Charges towards laying PVC conduit for electric points, at partition included wires. | NOS | Wiring | Get rate |
| Charges towards loading, unloading, and shifting of workstations (80 nos.) from the old V-Mart office to the 3rd floor of the new V-Mart Head Office. | NOS | Dismantling | Get rate |
| Charges towards modification of duct, sprinkler etc with all necessary materials | NOS | Ducting | Get rate |
| Charges Towards New 15 electrical Points with 8 module face plate /Box having 6amp 3 socket & 1 6amp swtich ,etc.inclduing of all wire & conduit etc. 1) 10mtr wire 2) 6Amp Switch:- 1Nos.3) 6Amp Socket:- 3Nos.4) 25mm PVC conduit. 5) 25mm Flexible, | NOS | Wiring | Get rate |
| Charges towards plumbing repairing with required CPVC fittings like 1 inch PVC pipe,Elbow,etc | NOS | Water Supply | Get rate |
| Charges towards plumbing work drainpipe work | NOS | Drainage | Get rate |
| charges towards polishing on door frame & doo redge | NOS | Doors | Get rate |
| Charges towards Polythene Cover up for Make Safe Assets/Carpet | NOS | Protection Works | Get rate |
| Charges towards provision of access control for doors | NOS | Access Control | Get rate |
| Charges towards raceway marking and chipping of existing floors as per site requirement, 200 x 40mm | NOS | Demolition | Get rate |
| Charges towards Raceway Marking and Chipping of the Existing Floors as per Site Requirement, 100x40 mm | NOS | Demolition | Get rate |
| Charges towards Raceway Marking and Chipping of the Existing Floors as per Site Requirement, 400x40 mm | NOS | Core Cutting | Get rate |
| Charges towards removal of debris from site | NOS | Debris Removal | Get rate |
| Charges towards removing and Refixing of existing carpet | NOS | Carpet Tile | Get rate |