| On The Floor whole conduct clip, And fastrer, Tierod, eable Trey, All Remove to ceilling work done. | NOS | Dismantling | Get rate |
| Open Battery Rack + Battery Connecting Cable + GAR Film + UPS to Battery Bank Cable, 5 Metre, 2 Runs with Each UPS | NOS | Battery Bank | Get rate |
| OPEN CELL CEILING - Providing & Fixing of 100 mm x 100 mm Open-Cell Ceiling with GI sections and powded coated profiles | NOS | Open Cell Ceiling | Get rate |
| Open Cell, GI Coil Coated, White, 100x100, 40mm, 0.35mm, 1.0mm per qty | NOS | Open Cell Ceiling | Get rate |
| Open Cell, GI Coil Coated, White, 100x100mm, 40mm, 0.35mm | NOS | Open Cell Ceiling | Get rate |
| Open End Spanner | NOS | MS Fabrication | Get rate |
| Open Storage, 20mm, 18mm Green Ecotech Ply, Laminate of Selected Shade and Code | NOS | Cabinet | Get rate |
| Open timbering in case of shafts, wells, cesspits, manholes and the like — | SQM | — | Get rate |
| Open timbering in case of shafts, wells, cesspits, manholes and the like — | SQM | — | Get rate |
| Open timbering in case of shafts, wells, cesspits, manholes and the like — | SQM | — | Get rate |
| Open timbering in trenches including strutting and shoring complete — Depth | SQM | — | Get rate |
| Open timbering in trenches including strutting and shoring complete — Depth | SQM | — | Get rate |
| Open timbering in trenches including strutting and shoring complete — Depth not | SQM | — | Get rate |
| Open timbering over areas including strutting, shoring etc. complete. — Depth | SQM | — | Get rate |
| Open timbering over areas including strutting, shoring etc. complete. — Depth | SQM | — | Get rate |
| Open timbering over areas including strutting, shoring etc. complete. — Depth | SQM | — | Get rate |
| Operator (Pile/ Special machine) | DAY | — | Get rate |
| OPF-2E STD BM | NOS | Handles | Get rate |
| OPF-2E-STD BM | NOS | Handles | Get rate |
| OPF-2E STD SSS | NOS | Handles | Get rate |
| OPF-2 Standard SSS | NOS | SS Fabrication | Get rate |
| OPF-2 STD BM | NOS | Handles | Get rate |
| OPF-2 STD BM Top Patch | NOS | Glass Door | Get rate |
| OPF-2 STD BM, Top Patch, Ozone MAKE, Model GLSSA1938OOPL | NOS | Glass Door | Get rate |
| OPF-2 STD SSS | NOS | Hinges | Get rate |
| OPF-3E STD BM | NOS | Handles | Get rate |
| OPF-3E-STD BM | NOS | Handles | Get rate |
| OPF-3E STD SSS | NOS | Closers | Get rate |
| OPF 3 STANDARD SSS | NOS | Handles | Get rate |
| OPF-3 STD BM | NOS | Storage Cabinet | Get rate |
| OPF-3 STD BM, Bottom Patch | NOS | Closers | Get rate |
| OPF-3 STD SSS | NOS | Handles | Get rate |
| OPF-610 STD SSS | NOS | Closers | Get rate |
| Opl-1 E | NOS | Wiring | Get rate |
| OPL-1E STD BM | NOS | Locks | Get rate |
| OPL-1 STD BM | NOS | Locks | Get rate |
| OPL-1 STD BM Lock | NOS | Locks | Get rate |
| OPL-1 STD SS | NOS | Locks | Get rate |
| OPL-1 STD SSS | NOS | Locks | Get rate |
| OPP CHR 15053PM ANGLE COCK | NOS | CP Fittings | Get rate |
| OPP-CHR-15233NKPM Jaquar Exposed Part for Basin Mixer Opal Prime | NOS | CP Fittings | Get rate |
| OPS-3 8MM STANDARD | NOS | SPC Flooring | Get rate |
| OPS-4 (10RFT 12MM) | NOS | Hinges | Get rate |
| OPS-4 (10RFT 12MM), Sensor Door Fittings | NOS | Sliding Door | Get rate |
| OPS-WH, P180UFS, M, Model T-15955 | NOS | Sanitary | Get rate |
| OPTRA 300X1200X15MM - 40/- PC/BOX | NOS | Vitrified | Get rate |
| Optra White 15mm Tile 600*600 Micro look (20Pcs/1Box) | NOS | Ceramic | Get rate |
| Optra white 15x600x600 Micro look | NOS | Mineral Fiber Ceiling | Get rate |
| Optra White Micro look 600x600x15mm | NOS | Mineral Fiber Ceiling | Get rate |
| Optra White Tile 600x600x15 mm Microlook edge Armstrong ( 20 Pcs in 1 Box ) | NOS | Mineral Fiber Ceiling | Get rate |