| KRON MODULE | NOS | Wiring | Get rate |
| KUBER POP (14KG) | NOS | POP Ceiling | Get rate |
| KUDAL | NOS | Debris Removal | Get rate |
| KUF, AUTOMATIC URINAL WITH SENSOR (BATTERY+ ELECTRICAL) | NOS | Urinal | Get rate |
| Kumin DM Sensor FCT W/O Drain, Cold Only, Kohler MAKE, Model 18655IN-ND-CP | NOS | CP Fittings | Get rate |
| Kumin DM Sensor FCT W/O Drain Cold Only, Model 18655IN-ND-CP | NOS | CP Fittings | Get rate |
| Kumin IR Sensor Faucet, Cold Only, DC, CP, 18656IN-NDR-CP, Kohler MAKE | NOS | CP Fittings | Get rate |
| KW Arrow Grey Pro Tile, 600x1200mm | NOS | Vitrified | Get rate |
| KW Bowmore Taupe, 60x120 | NOS | Vitrified | Get rate |
| KW Corsica Beige Pro, 60x60 | NOS | Vitrified | Get rate |
| KW MAGNUM BEIGE MATT | NOS | Vitrified | Get rate |
| KW ONYX BLONDE | NOS | Vitrified | Get rate |
| KW Opel Marfil, Pro Size 60x120 | NOS | Ceramic | Get rate |
| KW Oslo Marfil Matt, 60x60, Pro Size | NOS | Vitrified | Get rate |
| KW Satuario Splendid, 60x120, Swift Pol, Pro Size | NOS | Marble | Get rate |
| KW Satuario Splendid, Swift Pol, 60x120, Pro Size | NOS | Marble | Get rate |
| KW Silvia Pol Pro, 60x120 | NOS | Marble | Get rate |
| KW Sydney Mist, 60x120 | NOS | Granite Flooring | Get rate |
| KW TITLIS POL | NOS | Marble | Get rate |
| KW Venchy Grey Pol Pro, 60x60 | NOS | Vitrified | Get rate |
| L104 TRACTOR EMULSION | NOS | Paint | Get rate |
| L104 TRACTOR SPARC | NOS | Paint | Get rate |
| L 1200mm x 2400mm H | NOS | Gypsum Partition | Get rate |
| L 2000mm x 2400mm H | NOS | Gypsum Partition | Get rate |
| L-315 PLUS GREY ADHESIVE-20KG | NOS | Tile Flooring | Get rate |
| L-335 GREY -20 KG. BAG | NOS | Putty | Get rate |
| LA-08, Unicorn MAKE, Model VU 81 | NOS | Branding Graphics | Get rate |
| LA-16, Unicorn MAKE, Model VU 101 | NOS | Chair | Get rate |
| Labelling Cost | NOS | Annual Maintenance Contract | Get rate |
| LABOR | NOS | Demolition | Get rate |
| Labor and silicon charges for installation charges | NOS | Protection Works | Get rate |
| Labor charges | NOS | Annual Maintenance Contract | Get rate |
| Labor charges for dimantaling of cement mortar for thickness of tiles above 25 mm and upto 40 mm and clearing the debris. | NOS | Demolition | Get rate |
| Labor charges for pumpdowning the 12 HP & 18 HP VRF system for dismantling the connected refrigerant piping of Indoor units along with necessary electrical connections. | NOS | VRF | Get rate |
| Labor charges for removing the floor carpet and shifting to basement store. | NOS | Dismantling | Get rate |
| Labor fitness certificate charges | NOS | Annual Maintenance Contract | Get rate |
| Labor payment | NOS | Demolition | Get rate |
| Labor Payment as per attached attendance | NOS | Annual Maintenance Contract | Get rate |
| Labor Payment (Dec 25) | NOS | Corrective Maintenance | Get rate |
| Labor Payment (Open PO) | NOS | Breakdown Service | Get rate |
| Labor Supply, Period: 01-June-2026 to 30-June-2026 | NOS | Annual Maintenance Contract | Get rate |
| Labor Supply, Period 11-May-2026 to 31-May-2026 | NOS | Annual Maintenance Contract | Get rate |
| Labor Wages | NOS | Corrective Maintenance | Get rate |
| labour | NOS | Breakdown Service | Get rate |
| Labour and Cartage | NOS | Debris Removal | Get rate |
| Labour attendance | NOS | Annual Maintenance Contract | Get rate |
| Labour + cartage charges | NOS | Annual Maintenance Contract | Get rate |
| Labour charegs of all carpentry work projector camera stand | NOS | Projector | Get rate |
| Labour Charge | NOS | Dismantling | Get rate |
| Labour charge and exsiting floor tile dismentaling work. | NOS | Dismantling | Get rate |