| Fire sprinkler 2 point | NOS | Sprinkler | Get rate |
| Fire Sprinkler System Work as per attached annexure | NOS | Sprinkler | Get rate |
| Fire Stop | MTR | — | Get rate |
| First Aid Box | NOS | Protection Works | Get rate |
| First Aid Box (5%) | NOS | Protection Works | Get rate |
| First Aid Box, ABS Plastic Unbreakable Body, Transparent Front, with Contents, Wall Mounting Bracket, Size 13"X8"X5", Item Code AG/FAB/09, AG MAKE | NOS | Protection Works | Get rate |
| First Aid Kit | NOS | Protection Works | Get rate |
| First Aid Kit, 30 Contents | NOS | Protection Works | Get rate |
| First class kail wood in planks 10 | CUDM | — | Get rate |
| First class teak wood in planks 10 | CUDM | — | Get rate |
| First class teak wood in scantling 10 | CUDM | — | Get rate |
| First Floor Dining Area HVAC Work as per Attached Annexure | NOS | Ducting | Get rate |
| First Floor floor electrical work labour only | NOS | Wiring | Get rate |
| First Floor: Floor Raceway Chaz Cutting & Conduit Wall Chaz Cutting, Box Fixing, Wire Laying & Existing Wire Testing & Dismantling | NOS | Wiring | Get rate |
| First Floor: LT Panel Dismantling & Panel Shifting & All Existing Main Cable Removed and Relaying & Panel Termination and Commissioning with Testing with Material | NOS | LT Panel | Get rate |
| First Floor Storage, 18mm Ply, Waterproof (Green/Century), 2400x515mm, Both Side Merino Laminate, with Hardware (Hettich/Ebco) | NOS | Cabinet | Get rate |
| FIT OUT 2.7 SCAFFOLD HEIGHT | NOS | Barricading | Get rate |
| FIT OUT 2 MTR SCAFFOLD HEIGHT | NOS | Temporary Partition | Get rate |
| Fit Out 2 Mtr Scaffold Height, 01-01-2026 to 31-01-2026, Invoice: 867899, Invoice Date: 01-02-2026 | NOS | Barricading | Get rate |
| Fit Out 2 Mtr Scaffold Height, 01-03-2026 to 31-03-2026, Invoice 868070, Invoice Date 31-03-2026 | NOS | Protection Works | Get rate |
| Fit Out 2 Mtr Scaffold Height, 01-05-2026 to 31-05-2026, Invoice: 868698, Invoice Date: 01-06-2026 | NOS | Protection Works | Get rate |
| [FITOUT30] FIT OUT 3 MTR SCAFFOLD HEIGHT (Rental) | NOS | Temporary Partition | Get rate |
| FIT OUT 3 MTR SCAFFOLD HEIGHT | NOS | Protection Works | Get rate |
| FIT OUT 3 MTR SCAFFOLD HEIGHT (Tax invoice no. 661423) | NOS | Temporary Partition | Get rate |
| Fit Out Scaffold, 2.7m Height, 1 May 2026 to 31 May 2026, Invoice No. 868699, Invoice Date 01-06-2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 2.7m Height, 7-May-2026 to 31-May-2026, Invoice No. 868700, Invoice Date 01-06-2026 | NOS | Barricading | Get rate |
| Fit Out Scaffold, 2.7m Height, From: 1 Apr 2026 To: 30 Apr 2026, Invoice No.: 868608, Invoice Date: 01-05-2026 | NOS | Barricading | Get rate |
| Fit Out Scaffold, 2 Mtr Height | NOS | Temporary Partition | Get rate |
| Fit Out Scaffold, 2 Mtr Height, 01-04-2026 to 30-04-2026, Invoice No. 868607, Invoice Date 01-05-2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 2 Mtr Height, Invoice 867837, Invoice Date 01-01-2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 2 Mtr Height, Period: 01-02-2026 to 28-02-2026, Invoice: 867981, Invoice Date: 01-03-2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 3 Mtr Height, 1-Apr-2026 to 20-Apr-2026, PO: AIMSP-1055, Invoice No.: 768712, Invoice Date: 21-04-2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 3 Mtr Height, 1-Mar-2026 to 31-Mar-2026, Po: AIMSP-1055, Invoice No.: 768201, Invoice Date: 31-03-2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 3 Mtr Height, 21-Feb-2026 to 28-Feb-2026, PO: AIMSP-1055, Invoice No.: 768098, Invoice Date: 01-03-2026 | NOS | Barricading | Get rate |
| Fit Out Scaffold, 3 Mtr Height, 22-Jan-2026 to 31-Jan-2026, PO AIMSP-1055, Invoice No. 767998, Invoice Date 01-02-2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 3 Mtr Height, From: 1 Apr 2026 To: 30 Apr 2026, Invoice No. 662257, Invoice Date: 1 May 2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 3 Mtr Height, From: 1 Mar 2026 To: 31 Mar 2026, Invoice No.: 661634, Invoice Date: 31 Mar 2026 | NOS | Protection Works | Get rate |
| Fit Out Scaffold, 3 Mtr Height, From 1 May 2026 To 31 May 2026, Invoice No. 662569, Invoice Date 01 June 2026 | NOS | Temporary Partition | Get rate |
| FIT OUT STAIRWAY PACK | NOS | Staircase | Get rate |
| Fit Out Stairway Pack, 7-May-2026 to 31-May-2026, Invoice No. 868700, Invoice Date 01-06-2026 | NOS | Protection Works | Get rate |
| Fit Out Stairway Pack, From: 1 Apr 2026 To: 30 Apr 2026, Invoice No. 662257, Invoice Date: 1 May 2026 | NOS | Staircase | Get rate |
| Fit Out Stairway Pack, From 1 Apr 2026 To 30 Apr 2026, Invoice No 868608, Invoice Date 01-05-2026 | NOS | Dismantling | Get rate |
| Fit Out Stairway Pack, From: 1 Mar 2026 To: 31 Mar 2026, Invoice No.: 661634, Invoice Date: 31 Mar 2026 | NOS | Staircase | Get rate |
| Fit Out Stairway Pack, From 1 May 2026 To 31 May 2026, Invoice No. 662569, Invoice Date 01 June 2026 | NOS | Protection Works | Get rate |
| Fit Out Stairway Pack, From 1 May 2026 To 31 May 2026, Invoice No. 868699, Invoice Date 01-06-2026 | NOS | Protection Works | Get rate |
| Fit Out Stairway Pack, Per Month | NOS | Annual Maintenance Contract | Get rate |
| Fit-Out Stairway Pack, Tax Invoice No. 661423 | NOS | Dismantling | Get rate |
| Fitter (grade 1) | DAY | — | Get rate |
| Fitting | NOS | CP Fittings | Get rate |
| Fitting charges | NOS | Breakdown Service | Get rate |