QP QuantProc Catalogue
WebsiteLive DemandJoin free

Construction Material & Services Catalogue

17,935 standardised items with live market rates from verified suppliers. Search yours, get quotes in minutes.
ItemUnitCategory
Extra Charges, 1% Cartage: 1483.21/-, 15% Contractor Overhead: 22248.15/-, 1% Labour Cess: 1483.21/-NOSAnnual Maintenance ContractGet rate
Extra for 6 mm thick clear heat strengthened glassNOS—Get rate
Extra for additional cost of centering for arches exceeding 6m span includingSQM—Get rate
Extra for additional cost of centering for arches exceeding 6m span includingSQM—Get rate
Extra for additional height in centering, shuttering where ever required —SQM—Get rate
Extra for additional labour for circular works, such as in frames of fan lightM3—Get rate
Extra for additional labour for circular works, such as in frames of fan lightM3—Get rate
Extra for additional labour for circular works, such as in frames of fan lightM3—Get rate
Extra for brick work / AAC block masonry / Tile brick masonry in superstructureM3—Get rate
Extra for circular cutting in C.G.S. sheet roofing for making opening of — 0.63MTR—Get rate
Extra for circular cutting in C.G.S. sheet roofing for making opening of — 0.80MTR—Get rate
Extra for circular cutting in C.G.S. sheet roofing for making opening of — 1.00MTR—Get rate
Extra for Circular cutting including wastages in ceiling with: — 12 mm thickMTR—Get rate
Extra for Circular cutting including wastages in ceiling with: — 12 mm thickMTR—Get rate
Extra for Circular cutting including wastages in ceiling with: — 12 mm thickMTR—Get rate
Extra for Circular cutting including wastages in ceiling with: — 2nd class teakMTR—Get rate
Extra for Circular cutting including wastages in ceiling with: — 3 mm thickMTR—Get rate
Extra for Circular cutting including wastages in ceiling with: — 4.5 mm thickMTR—Get rate
Extra for circular cutting in reinforced by organic fibres and/or inorganicMTR—Get rate
Extra for concrete work in superstructure above floor V level for each fourM3—Get rate
Extra for coursed rubble masonry with hard stone (first or second sort) curvedM3—Get rate
Extra for coursed rubble masonry with hard stone (first or second sort) in: —M3—Get rate
Extra for coursed rubble masonry with hard stone (first or second sort) in: —M3—Get rate
Extra for cutting rebate in flush door shutters (Total area of the shutter toSQM—Get rate
Extra for Cutting Reinforcement Bars, Manually / By Mechanical Means, in RCC or RB Work, Payment on Cross-sectional Area of RCC or RB Work, as per Direction of Engineer-in-ChargeSQMCuttingGet rate
Extra for every additional 1 cm thickness of mud phaska.SQM—Get rate
Extra for every additional lift of 1.5 m or part thereof in excavation / —M3—Get rate
Extra for every additional lift of 1.5 m or part thereof in excavation / — AllM3—Get rate
Extra for excavating trenches for pipes, cables, etc. in ordinary/hard — Pipes,MTR—Get rate
Extra for excavating trenches for pipes, cables, etc. in ordinary/hard — Pipes,MTR—Get rate
Extra for excavating trenches for pipes, cables, etc. in ordinary/hard — Pipes,MTR—Get rate
Extra for excavating trenches for pipes, cables, etc. in ordinary/hard — Pipes,MTR—Get rate
Extra for excavating trenches for pipes, cables, etc. in ordinary/hard — Pipes,MTR—Get rate
Extra for excavating trenches for pipes, cables, etc. in ordinary/hard — Pipes,MTR—Get rate
Extra for excavating trenches for pipes, cables, etc. in ordinary/hard — Pipes,MTR—Get rate
Extra for fixing marble /granite stone, over and above corresponding basicMTR—Get rate
Extra for forming cavity 5 cm to 11.5 cm wide in cavity walls with necessarySQM—Get rate
Extra for Gypsum panel Partitions in superstructure above floor V level forSQM—Get rate
Extra for half brick masonry in superstructure, above floor V level for everySQM—Get rate
Extra for Half Brick Masonry, Superstructure, Above Floor V Level, Every 4 Floors or Part Thereof, By Mechanical MeansSQMHalf BrickGet rate
Extra for Kota stone/ sand stone in treads of steps and risers using singleSQM—Get rate
Extra for laying brick work in or under foul position.M3—Get rate
Extra for laying concrete in or under foul positions.M3—Get rate
Extra for laying reinforced cement concrete in or under foul positions.M3—Get rate
Extra for laying reinforced cement concrete in or under water and/ or liquidM3—Get rate
Extra for laying stone work in or under foul condition.M3—Get rate
Extra for laying terrazo flooring on staircase treads not exceeding 30 cm inSQM—Get rate
Extra for levelling & neatly dressing of disposed soil completely as directedM3—Get rate
Extra for making chequers of approved pattern on cement concrete floors, steps,SQM—Get rate
Extra for marble stone flooring in treads of steps and risers using singleSQM—Get rate
← Prev Page 111 of 359 · 17,935 items Next →
Powered by QuantProc™ · quantproc.com