QP
QuantProc Catalogue
Website
Live Demand
Join free
Catalogue
› Demolition
Demolition — rates & suppliers
107 Demolition items. Pick an item to get today's market rate and quotes from verified suppliers, free on WhatsApp.
Join free — buy or supply
10 MITER RAJMAL
1st floor TRAINING 5 (ADDITION) Work as per attached annexure
1ST FLOOR WASHROOM RENOVATION
20 PIC ROLLI
4" Cutting Wheel
4 SDI BLADE (PAPER CUTTER)
Angle Grinder, 670W, 4 inch, 522296489, Bosch MAKE, Model GSW 670
AXE BLADE
Bathroom tile dismantling fixing with adhesiv
bevelled charges
Blade
Breaker Machin
Carpenter Labour (Open PO)
Carpenter Work, As per attached annexure
Charges Towards Dismantling of wall for electrical pipes & replastering on it with 1:4 ratio of cement sand mortar.
Charges towards dismantling of Wall tiles with all required tools
Charges towards floor chipping work and refinishing the same
Charges towards raceway marking and chipping of existing floors as per site requirement, 200 x 40mm
Charges towards Raceway Marking and Chipping of the Existing Floors as per Site Requirement, 100x40 mm
Chhota Hatha – 1 No. and Labour Expenses
CHIESEL / CHENNI
Chipping Blade
Civil & Interior Work (As per attached annexure)
Day & Night time floor chipping labour (5 person x 2 Wages)
Demolishing Brick Work, Manually / By Mechanical Means, Including Stacking of Serviceable Material & Disposal of Unserviceable Material, 50 M Lead, In Cement Mortar, As Directed by Engineer-in-Charge
Demolishing brick work of any thickness manually/ by mechanical and disposal of debris to contractor's own dump outside the compound as per direction of Engineer in-charge.
Demolishing of flooring of any type (tile/ kota/ granite/ marble/ cast -in-d-situ marble mosaic etc.) by manually/ mechanical and disposing off as per direction of Engineer-in-charge.
Demolishing plain cement concrete of any thickness manually/ by mechanical means, cutting of reinforcment bars etc including stacking the reusable materials and removed unserviceable materials / debris as per direction of Engineer - in - charge.The disposal of removed material / debris out side the
Demolishing RCC Work, Manually / By Mechanical Means, Including Stacking of Steel Bars & Disposal of Unserviceable Material, 50 M Lead, As Directed by Engineer-in-Charge
Demolition of Cement Concrete (Below Finishing Layer incl. Waterproofing, Flooring, Sand Stone, Basalt Stone, Ceramic & Vinyl Flooring), Steps & Blockages, Manually, All Heights, All Leads & Lifts, incl. Disposal of Material, Safety Measures & Specified Equipment for Workers, Without Damaging Histor
Demolition of Cement Concrete (Below Finishing Layer incl. Waterproofing, Flooring, Sand Stone, Basalt Stone, Ceramic & Vinyl Flooring), Steps & Blockages, Manually, All Heights, All Leads & Lifts, incl. Disposal of Material, Safety Measures & Specified Equipment for Workers, Without Damaging Histor
Demolition of Cement Concrete (Below Finishing Layer incl. Waterproofing, Flooring, Sand Stone, Basalt Stone, Ceramic & Vinyl Flooring), Steps & Blockages, Manually, All Heights, All Leads & Lifts, incl. Disposal of Material, Safety Measures & Specified Equipment for Workers, Without Damaging Histor
Demolition of Cement Concrete (Below Finishing Layer incl. Waterproofing, Flooring, Sand Stone, Basalt Stone, Ceramic & Vinyl Flooring), Steps & Blockages, Manually, All Heights, All Leads & Lifts, incl. Disposal of Material, Safety Measures, Specified Equipment for Workers, Without Damaging Histori
Demolition of RCC Work, Manually / By Mechanical Means, Including Stacking of Steel Bars & Disposal of Unserviceable Material, All Heights, All Leads & Lifts, Scaffolding / Support Frame, Safety Measures & Specified Equipment, Without Damaging Historic Fabric of Building, As Directed by Engineer-in-
Demolition work :Dismantling/Carefully removing, breaking ,demolishing :Existing Granite stone,ms structure,wash basin,
Disc Regmar, Flap Disc, 50 No.
Dismantling and Demolishing of RCC work including or plain cement concrete anywhere carefully manually or by mechanical means, cutting of reinforcment bars etc including stacking the reusable materials and removed unserviceable materials / debris at site as per direction of Engineer - in - charge.Th
Dismantling of Dishwash and Hand Wash, Existing PCC Brickbat Coba with Sunken Area and Pipeline
Dismantling of existing floor for TV cabling & repair and arpet fix
Dismantling of existing PCC Brickbat Coba with sunken area and pipe line
Dismantling of Gents and Ladies Washroom Existing PCC Brickbat Coba with Sunken Area and Pipeline
Dismantling of Handicap washroom existing pcc brickbat cobs with sunken area.
Dismentaling of Gents and ladies washroom existing PCC brickbat coba with sunken area and pipe line.
Dismentaling of gents and ladies washroom exsiting PCC brickat coba with sanken area and pipe line.
Dismentaling of gentsand ladies washroom exsiting PCC brickat coba with sanket area and pipe line.
Dismentaling of suken area at Handicap washroom exsiting pcc brick at coba with sunken area.
Dismentalling Of Cement Concerete include Dispose the malba from site
Dismentalling of Rcc Include Dispose The Malba From Site
Estar bit tapariya
Floor and Wall tiles chipping work and Wall demolition works. including Debris shifting to client requested area.
Floor Chipping: Chipping of and removing of existing concrete with all necessary tools tackles, and closing the same with the concrete as per the standards, 200mm
Floor Chipping: Chipping of and removing of existing concrete with all necessary tools tackles, and closing the same with the concrete as per the standards for 200mm raceway
GRINDER BLADE METAL CUTTING 4"
Grinder machine
HAMMER
HAMMER 1LB
Hammer Bit, 6mm
HOF Installation, Wall
Housekeeping Labour, Feb, Mar, Apr, May, Jun, Jul, 25 Days x 5 Months = 125 Person x 850, Deduction
Iron Cutter
January labour payment
JIG SAW BLADE
KASSI / FAWDA LOCAL WITHOUT HANDLE
LABOR
Labor charges for dimantaling of cement mortar for thickness of tiles above 25 mm and upto 40 mm and clearing the debris.
Labor payment
Labour Charge, Existing Floor and Wall Tile Dismantling Work
Labour Charge, Existing Wall Tiles Removing Work, Ladies Washroom, Six to Eight Tiles Breakage Depending on Work
Labour Charge for Existing Floor and Wall Tile Dismantling Work
Labour charge of existing concealed cistern tank and brick wallwall dismantling work.
Labour charge of existing floor tile dismantling and washroom existing PCC brickbat coba with sunken area dismantling
Labour charges
Labour charges for Removal of existing Damaged and faded Wall Mirrors, 6mm thickness, Handwash area, sizes: L-1803mm x H-1066mm, L-1422mm x H-1066mm, L-863mm x H-1066mm, UOM (1PC=1LS)
Labour payment
Labour work - 13 April 2024
LIFTING LABOUR
Lift Loby area Ceiling , Tiles, Partition Demolition
Man Power supply (Carpenter)
Man Power Supply, Carpenter, Open PO
Modification Work at TP Ambit IT Park (As per attached annexure)
Night time floor chipping labour (6 person x 2 Wages)
Only Floor Demolition Work
PALTI PATRA 4"
Plain cutting round & straight sheet (Labour)
Power Tool, Demolition, 5KG, KPT MAKE
Raceway Marking and Chipping of existing floors as per site requirement, 300x40mm
RCC Demolish
RCC dismentalling
Removal of concrete by manual and clean the entire track channel
Removing existing false ceiling: Gypsum board/ mineral fiber or any type of suspended ceiling systems, HVAC diffusers, grilles, dampers mounted on or recessed in the ceiling and removal of debris from site to basement/parking level through stair/service l
Removing of existing tile and chipping the floor.
RENOVATION WORK AT MSDE DELHI
REWORKING CHARGES
Santrash charges for floor chipping
SOIL - SOIL DIGGING 1000X1000X5' - AS PER DRAWING
Star bit
STAR BIT 65MM PH2
TCT Circular Saw Blade, 4", 4*20*40T, JKTCTWC4(40), SD9060241, JK Wood MAKE
Toilet Demolition - 2 Nos; Toilet Area PCC Demolition - 1 Lot
waipar galas
Wall tile demolition
Washroom renovation work as per attached annexure.
Wire Brush, Brush Carpet
Wood cutter blade 4 inch
WOOD CUTTING BLADE 5"
XP STARBIT
XP WOOD BLADE TCT CIRCULAR SAW 4"
Powered by QuantProc™ ·
quantproc.com